Poudre Valley Hospital

Project Description

The owner had specific scheduling needs that had to be met from an operational standpoint for the hospital and Drahota was heavily involved during preconstruction and construction, which allowed the project to finish ahead of schedule.

 

Drahota worked with doctors, nurses and the hospital facilities team to maintain limited disturbance, which was instrumental to the success of this project. “Using Drahota’s talent and knowledge both in communication and problem solving during all phases of construction was key,” said Dave Cottle, Director, Poudre Valley Health System.